一般来说,光伏组件做完PID(Potential-induced degradation)测试后看下功率衰减和EL图,这个测试就算结束了。但标准的编写者和技术人员不这么看。PID的前、后有多项测试要做,这些测试不限于外观、绝缘、初始稳定、功率测试、最终稳定等等……
您如果遇到以下案例,您的看法是什么,下一步如何做?
案例:
已知某客户在某实验室委托了PID测试,2件组件(A组件、B组件),其中A:-1500V PID测试,B:+1500V PID测试。PID出箱后测试I-V性能,A衰减10%以上,B几乎无衰减。
简要说:
A可以做最终稳定,B正常进行其他后续测试。
详细说:
首先,IEC现行的光伏组件标准里,涉及到PID测试的有两份,一份是IEC 61215-2:2021和IEC 61215-1-1:2021系列,另一份是IEC TS 62804-1:2025。从标准编码来看,IEC 61215的抬头是“INTERNATIONAL STANDARD”,我们常理解为光伏组件必须满足的国际标准,而后者的抬头是“TECHNICAL SPECIFICATION”,简写为“TS”,我们常理解为技术导则,可以按实际情况选择。这里我们主要看两份标准对“最终稳定”的描述。
在IEC 61215-2:2021中对最终稳定的描述如下:
4.19.6 Final stabilization (MQT 19.2)
Final stabilization is performed following procedure and requirements defined in MQT 19. Stabilization is reached if 4.19.2 is fulfilled.
The final stabilization is performed to determine module degradation during the test as defined in the pass criterion in IEC 61215-1:2021, 7.2.3 (Gate No. 2).
If not otherwise stated all modules from sequences A, and C to E have to undergo MQT 19.2 testing.
在IEC 61215-1-1:2021中继续为最终稳定做了补充说明,如下:
11.19.5 Final stabilization (MQT 19.2)
Final stabilization (MQT 19.2) is not required, except for modules that have been tested according to MQT 21, Potential induced degradation test (in sequence F), or MQT 13, Damp heat test (in sequence E). Final stabilization requirements differ depending on whether the module has been subjected to MQT 13 or MQT 21.
For modules that have been tested according to MQT 13, damp heat test (in sequence E), a choice of two final stabilization methods, "Method 1" or "Method 2", is available:
……(此处有省略,详见标准原文)
For modules that have been tested according to MQT 21, PID (in sequence F) a choice of two final stabilization methods, "Method 3" or "Method 4", is available:
……(此处有省略,详见标准原文)
总的来看,参考上述IEC 61215系列标准,如果PID后组件功率衰减超过Gate No.2,则进行最终稳定。
最终稳定的试验条件是什么样的?我们看原文描述如下:
Method 3)
- Modules shall be exposed to an irradiation of (2,0±0,2) kWh/m2.
- Exposure shall be performed as per IEC 61215-2:2021 MQT 10, with the temperature and spectrum meeting the requirements specified therein. Heat-up, exposure, and cool-down shall be performed such that the module spends less than 24 h above 40 °C. The only differences between the exposure in Method 3 and that in MQT 10 are the total dose, which side of the module is exposed, and the addition of a time limit.
- For bifacial modules, the irradiance shall be applied to the rear side, whereas for monofacial modules, the irradiance shall be applied to the front side.
- The class CCC solar simulator listed as required apparatus in MQT 19.2 shall fulfill the class C spectral requirements over at least the short-wavelength portion of the extended wavelength range described in IEC 60904-9.
- Record choice of stabilization method 3) in the test report.
- Final stabilization is complete. Proceed with the test flow defined in IEC 61215, which involves MQT 06.1 and gate No. 2.
根据以上这段原文,有人认为试验条件是UV irradiation of (2,0±0,2) kWh/m2, 也有人认为是模拟稳态光源或自然太阳光irradiation of (2,0±0,2) kWh/m2。个人的看法是后者更准确。原因是上述英文描述中第4段明确了应用于MQT 19.2的太阳模拟器(solar simulator)的等级以及标准号IEC 60904-9 (Photovoltaic devices - Part 9: Classification of solar simulator characteristics),从这里可以理解是模拟稳态光源或自然太阳光,而不是单一的UV光。标准中也明确了双面组件为背面接受辐照,单面组件为正面接受辐照。最终稳定的其他试验条件,比如组件温度按照MQT 10(UV preconditioning test)的条件(60+5)°C,组件电路连接方式为短路或者开路。
在IEC TS 62804-1:2025中,没有直接描述为最终稳定(Final stabilization),而是使用了“Test for PID-polarization recovery”,这里应该是参考了现有的技术研究成果和其他文献而做出的,我们在这里不再赘述。在这份标准中,恢复试验的条件如下:
5.4.3 Severities
Total irradiation of 100 Wh/m2±10 Wh/m2 in the range of 290 nm to 400 nm with irradiance
source specified in 5.4.2 a).
NOTE The dose of 100 Wh/m2 of UV irradiation with light source specified in IEC 61215-2 (MQT 10 – UV preconditioning test) corresponding to approximately that of 2h of full sun exposure incident on face of the module. Recovery of module power from PID with exposure of the normally sun facing side of the module can be anticipated in fielded modules if recovery in power is observed in this test. However, because the module back side receives significantly less exposure to UV irradiation, recovery of PID under the severities specified here do not suggest recovery of PID in field conditions.
Module temperature: 60°C±5°C
以上这段原文着重强调了UV光照剂量100 Wh/m2,并强调了UV波长范围,同时还补充说明了这种UV累积量大概相当于2小时的全太阳辐射量,可理解为2 kWh/m2的自然太阳光或模拟稳态光源其中的紫外部分剂量约为100 Wh/m2。另外要求组件电路连接方式须采用电阻负载。这份标准中Figure 7 - PID recovery test flow明确了组件每一面 (each side) 皆进行光照恢复试验。
总结:IEC 61215系列与IEC TS 62804-1关于PID测试后的最终稳定试验或者说恢复试验,两者试验条件基本一致,略有区别。
最终稳定试验或恢复试验条件对比:
标准 | 光源和 辐照剂量 | 辐照面 | 组件 温度 | 电路 连接 |
| IEC 61215:2021系列 | 模拟太阳光 (2.0±0.2) kWh/m2 | 双面组件背面 单面组件正面 | (60+5)°C | 短路或开路 |
| IEC TS 62804-1: 2025 | UV光 (100±10) Wh/m2,相当于2小时的全太阳辐射量 | 组件每一面 | (60+5)°C | 电阻负载 |
参考标准:
IEC 61215-2:2021 Terrestrial photovoltaic (PV) modules - Design qualification and type approval Part 2: Test procedures
IEC 61215-1-1:2021 Terrestrial photovoltaic (PV) modules - Design qualification and type approval - Part 1-1: Special requirements for testing of crystalline silicon photovoltaic (PV) modules
IEC TS 62804-1:2025 Photovoltaic (PV) modules - Test methods for the detection of potential-induced degradation - Part 1: Crystalline silicon